How to make capacity graph of a production line?
Making Capacity graph of a
production line very easily.
Now we will discuss about Capacity study:
Required tools:
- Stopwatch
- Study Sheet
- Pen/Pencil
- Clipboard
After arrange all those things, go to the line. Write down all the operation name on study sheet with operator’s name & ID by maintain sequence. Take 5 consecutive cycle time from each operator using stopwatch & write down this data to study sheet. By using calculator, take average cycle time & add allowance with this to get hourly capacity.
For example:
5 Cycle time: 50, 53,51,49,52
Average cycle time: 51
So SMV of that operator= 0.98 (With 15% allowance). It may vary.
Capacity his/her = (60/.98) = 61 pcs.
Take every operator capacity like this & record it.
Then make a capacity graph to see visually where to focus to develop.
Here you can
see a demo chart from a sweater unit. Process of making chart are always same
for other product also.
If a line hourly target is 46 pcs then we have
to see how many operations have below target line & how many operations
have over achievement. Focused on both for maximum production.
Conclusion:
The main job
in line after balancing is to eliminate or reduce WIP (work in process) at bottleneck
operations. To do that you have to know which operations are a bottleneck in
the line. Through capacity study and target setting, you will find existing
bottlenecks in the line.